Project Description

Project Description

The project included the installation of a new 28 x 40 foot block building water treatment station. The work consisted of water distribution pumps, piping and fittings, valves, piping appurtenances, HVAC equipment, drains and sump system, electrical equipment, conduit, and conductors. 322 lineal feet of 6-inch sanitary sewer pipe, 29 lineal feet of 8-inch storm drain, 354 lineal feet of 20-inch suction PVC, and 191 lineal feet of 20-inch discharge PVC. Additional site work consisted of the demolition of existing pump station, clearing, grading, backfilling, asphalt pavement, concrete pavement, sidewalk, and an addition of an ARV for the existing 36- inch main line.

Project Details

LOCATION: Ogden, Utah
DURATION: 50 weeks
PROJECT TYPES: Treatment Plants & Pump Stations

Unique Problem Solved

COP Construction had been tasked with demoing an existing and reconstructing a new well pump house to include the furnish and installation of a 1250 HP vertical pump.  With a semi-secluded, small footprint project site, maneuverability  and work sequence present challenges that are overcome by planning and coordinating with COP personnel and qualified Subcontractors.  Lastly, site power and sequencing challenges due to long lead times of electrical gear continue to exist.  With a proactive/ communicative  approach, COP and Subcontractor (Turner Electric) have teamed up to successfully meet the project owner (Weber Basin Conservancy District) requirements.

Let’s Build America Together Contact Us