Project Description

Project Description

The project consisted of the reconstruction of 2,800 linear feet of South 4th Street from Highway 212 West to South 8th Avenue. The project included a new urban street section with curb and gutter, sidewalks, pedestrian ramps, driveway approaches and new asphalt pavement. There was 3,100 linear feet of reconstructed water mains, including valves, fittings, fire hydrants. An additional 3,200 linear feet of new storm drain system included a storm drain detention pond and two hydrodynamic separators.

Project Details

LOCATION: Laurel, Montana
DURATION:  28 weeks
PROJECT TYPES: Underground Utilities

Unique Problem Solved

The reconstruction project was challenged by existing soil conditions continually changing due to weather conditions.

Let’s Build America Together Contact Us