Project Description

Project Description

The 2022 Water & Sewer Main Replacement project for the City of Billings included the replacement of 3,160 lineal feet of 8-inch PVC sewer main and 123 services by open cut trenching along with 7,530 lineal feet of 8-inch cure in place pipe (CIPP) with 221 sewer service reconnections. All work was completed in the downtown alleys of Billings, west of Division Street and south of Grand Avenue. The excavation depths ranged from 8 to 13 feet deep and were all located within the alley ways. The project was completed with no interruption to resident’s sewer service by bypassing sewer flows during construction.

Project Details

LOCATION: Billings, Montana
DURATION: 16 weeks
PROJECT TYPES: Underground Utilities

Unique Problem Solved

All crews involved did an exceptional job coordinating with the public and planning construction to complete the project safely within a tight working environment. The project was a huge success due to the skilled craft employees which were involved in construction.

Let’s Build America Together Contact Us