This project included a new RCP storm drainage system going up 22nd Street in Ogden to the connection point at Filmore Avenue. COP installed 1,865 lineal feet of 30-inch, 2,290 lineal feet of 24-inch, 395 lineal feet of 18-inch, and 1,260 lineal feet of 15-inch. This work was done in conjunction with a new watermain approximately 627 lineal feet of 8-inch C-900, gate valves, water meters and 1-inch services on Taylor Avenue. The project also included demolition and replacement of existing curb and gutter, sidewalk, dip stone pipes, catch basins, and manholes. COP installed a new 8” Sewer Main including manholes, laterals, and tie-ins.
Project Details
LOCATION: Ogden, Utah
DURATION: 40 weeks
PROJECT TYPES: Underground Utilities
Unique Problem Solved
The COP crews were dedicated and persevered through the challenges of design, unknowns, material procurement, and weather. All crews involved did a great job coordinating with the public and planning construction to complete the project safely.