Project Description

Project Description

The project constructed a new water treatment plant to support two wells and demolished the existing two well houses within a residential area. Public safety was critical while working around an active park in the center of the project. The project piping included 294 linear feet of 4-inch sewer, 476 linear feet of 12-inch storm drain, 476 linear feet of 12-inch drain line, 905 linear feet of 8-inch raw water, and 876 linear feet of 4-inch to 16 inch potable water. The self-performing scope included all excavation and grading, 453 cubic yards of concrete, all utility piping to include the filtration, UV disinfection, and the sodium hypochlorite system.

Project Details

CLIENT: Park City Municipal Corporation
DURATION: 18 Months
COST: 3,669,000

Let’s Build America Together Contact Us