Project Description
Project Description
The COP portion of the project consisted of 100 lineal feet of 18-inch casing and 200 lineal feet of 20-inch casing installed via pipe ram.
Project Details
LOCATION: Salt Lake City, Utah
DURATION: 7 Weeks
PROJECT TYPES: Hydro Excavation