Project Description

Project Description

The COP portion of the project consisted of 100 lineal feet of 18-inch casing and 200 lineal feet of 20-inch casing installed via pipe ram.

Project Details

LOCATION: Salt Lake City, Utah
DURATION: 7 Weeks
PROJECT TYPES: Hydro Excavation

Let’s Build America Together Contact Us